Know what's below

Know what's below

Tags: 

About 811        

When planning outdoor work that requires digging such as planting a tree, putting in a new children’s play set or excavating for construction, visit www.811Now.com or call 811 before you dig. WWVREMC is a member of 811Now, a free statewide service created to reduce damage to underground facilities and promote public safety by lowering the number of damage incidents. This is important because digging can be expensive and dangerous. Each year, millions of dollars in property damage, personal injuries and even loss of life occur because of careless digging where underground facilities were not located prior to excavating.

Follow these steps, before you begin your project:

  1. Once you have planned your project, visit www.811Now.com or call 811 to submit your request at least two full working days before digging.
  2. Provide the following information about the location and plans for your project:
    County
    Township
    Street Address
    Type of Work
    Your Name and Title
    Telephone Number
    Best Time to Call
    Start Date and Time
    Contractor
    Contractor Address
  1. Wait for member facility owners or operators to mark the proposed excavation site.
  2. Respect the marks. Once all utilities are checked, the ground will be marked with either a dotted line or a flag with “OK” painted on the ground. Dotted lines indicate underground lines and a flag and “OK” mean that there are no facility lines in that location and the area has been checked. Red, yellow, orange and blue markers should be present before you dig, indicating that all necessary utility lines have been checked.
  3. Dig with care.

For more information visit www.811Now.com.  

 

Page Features: